In a rental, the floor has to look good, hold up, be easy to keep clean and fit the budget. Laminate works for a lot of rentals because it looks the same from room to room and comes in lots of wood-look colours and plank sizes.

It still has to suit the room. Before anything gets ordered, look at more than the colour: what's on the floor now, the shape of the subfloor, any moisture, where it meets other floors, the doors, the appliances and when the install can happen.

Start with the rooms and how they are used

A quiet bedroom has different demands from an entryway, main hallway or connected living and kitchen area. Before comparing flooring, identify where it will be installed and how much traffic, moisture and daily wear the area receives.

For a rental property, consider:

  • How often the area is walked through
  • Whether tenants enter directly with wet footwear
  • Whether the flooring continues through several connected rooms
  • Whether pets are permitted
  • How easily a damaged board or matching product could be sourced later
  • Whether the product is approved for kitchens, basements or other moisture-prone areas

Choose a product intended for the application

Not every laminate is made for the same use. Check the manufacturer’s install instructions, warranty and which rooms it’s approved for. Don’t go by plank thickness or looks alone.

For a rental, look for a surface made for everyday household traffic, a locking system that goes down properly over the prepped subfloor, and a finish that doesn't show every scuff and speck of dust.

Water resistance also varies. Some laminate products provide improved protection from everyday spills, but that does not mean every product is waterproof or suitable for every damp location. Spills should still be cleaned promptly.

Use colour and pattern to simplify future turnovers

Mid-tone wood colours are often practical because they coordinate with a range of wall colours and furniture styles. Very dark floors can show dust and light debris, while extremely pale finishes may make stains and scuffs more noticeable.

When the floor runs through several connected rooms, using the same product throughout makes the space feel bigger and cuts down on transitions. Decide which way the planks run before install so they flow through the hallways, doorways and rooms beside them.

Wide view of completed laminate flooring across an Orillia living room and kitchen
Running the same laminate through connected rooms ties the space together.

Subfloor preparation affects the finished result

New flooring will not correct an unstable, damaged or uneven surface underneath it. Existing materials may need to be removed, loose areas secured and high or low spots addressed before laminate is installed.

Sometimes you can't tell how much prep is needed until the old floor comes up. A good estimate should say what's included for removal and what happens if there's damage or a problem underneath.

Floor height also matters. New laminate and underlayment can affect doors, trim, stair transitions, appliances and connections to tile or other flooring.

Turning over a unit soon?

Tell Rob which rooms, the rough square footage and your move-in date for a free written estimate. A typical install takes about 2 days.

Get My Free Estimate

Free and no obligation. Rob usually replies within about 24 hours.

Plan around occupancy and turnover timing

An empty unit is easier to work in than one with people living in it. If tenants are still there, talk ahead of time about moving furniture, getting into each room and which rooms get done first.

For a turnover project, allow time for old-floor removal, subfloor preparation, installation, trim or transition work and cleanup. Avoid scheduling new tenants, cleaners and other trades in the same space without confirming the sequence first.

Make the written estimate specific

A flooring estimate should identify the rooms involved and explain which parts of the work are included. Depending on the property, that may include:

  • Removal and disposal of existing flooring
  • Basic subfloor preparation
  • Underlayment or attached-pad requirements
  • Laminate installation and plank direction
  • Transitions between different floor types
  • Baseboard or quarter-round work
  • Door trimming or other finish adjustments
  • Furniture or appliance movement

Having it all in writing makes it easier to compare estimates, and nobody's confused later about prep, materials or finishing.

Flooring installation in Barrie, Angus and nearby communities

Hunt Contracting installs laminate, vinyl, vinyl plank and epoxy flooring in homes, rental properties and approved commercial spaces. Whether Rob can take your job depends on what it involves, when you need it done and where it is.

Common questions

Frequently Asked Questions

Is laminate flooring suitable for a rental property?

Laminate can be a practical choice when the product suits the room, the subfloor is prepared correctly and the flooring is maintained according to the manufacturer’s instructions.

Is laminate flooring waterproof?

Not every laminate product is waterproof. Some products offer improved water resistance, but spills still need prompt cleanup and the product must be approved for the intended room.

Can laminate be installed over an existing floor?

Sometimes, but only when the existing surface is stable, flat, clean and permitted by the flooring manufacturer. Floor height, transitions, doors and appliances must also be reviewed.

What information helps with a flooring estimate?

Provide room dimensions, photos, the property location, the existing flooring type, known damage, preferred timing and whether furniture or old flooring must be moved or removed.

Planning a flooring project?

Send Rob your address, which rooms, what's on the floor now and a few photos. Free written estimate.

Request a Flooring Estimate